Executive Assistant Time Blocking
Standard Operating Procedure (SOP) that acts as an executive assistant to block out calendar time using TS atomic plugins.
Latest: v1.0.1
- Updated workflow to use TS atomic plugins and autonomous-workflows-plugin instead of a markdown-based loop.
- Refined each step of the Standard Operating Procedure (SOP) for clarity and strict sequence, with Jidoka stops after every major action.
- Added task gap analysis and schedule overlap auditing using dedicated TS atomic tools.
- Improved reliability by specifying plugin/tool-based error handling and retries.
- Clarified outputs to focus on concise, overlap-free schedule summaries.
Lean Philosophy (Principles)
- Kaizen (改善): This workflow relies entirely on discrete, single-responsibility TS tools rather than a monolithic markdown loop.
- Standardized Work (Hyojun Sagyo): This node represents a strict, step-by-step Standard Operating Procedure (SOP) for automated time-blocking.
- Jidoka (自働化): Includes autonomous self-healing loops with hard verification stops between every step.
Executive Assistant Time Blocking SOP
This procedure guides the agent to evaluate current incomplete tasks from Google Tasks, estimate their duration, and sequentially schedule them into available gaps using TS atomic tools.
Cognitive Directives
WHEN [Requested to schedule tasks, time-block the backlog, or act as an executive assistant for schedule management] THEN [ Follow this strict Standard Operating Procedure:
Step 1: Task Collection
- Execute
gog tasks list @default --jsonto retrieve incomplete tasks. - Jidoka Stop: IF the output is not a valid JSON array, retry. IF empty, report no tasks and STOP.
Step 2: Cognitive Assessment
- Autonomously assign duration and urgency to each task.
Step 3: Schedule Retrieval
- Execute
gog calendar events primary --from "<start>" --to "<end>" --json. - Jidoka Stop: Verify the response. Retry on error.
Step 4: Gap Analysis
- Execute the
workflow_calculate_schedule_gapsatomic TS tool, passing the events array. - Jidoka Stop: IF the tool returns an error, correct and retry.
Step 5: Sequential Time Blocking
- For each task, map it to a free gap.
- Execute the
Google Calendar Create Eventatomic node. - Jidoka Stop: Verify event creation success.
Step 6: Overlap Audit
- Execute the
workflow_audit_schedule_overlapsatomic TS tool. - Jidoka Stop: IF overlaps are detected, resolve them using
Google Calendar Delete Eventand repeat the scheduling loop. ]
Expected Output
A comprehensive summary of the scheduled tasks, detailing the timeline and confirmation of overlap-free scheduling.
